INFO: NRE Services Contracting

All new custom projects, with a new Scope of Work (SOW), are required to first contract an engineering study in order to determine the specifications, criteria, BOM, NRE determination, and project Gant chart overview for the project.

The deliverables are a written report with those items documented in that report. Estimated time-frame for that document production is 30 days or less.  Client is required to provide up to one hour per day for feedback communication during that time-frame. The minimum billing for the Initial Engineering Study (IES) is $5000.00

Lim-Pac also accepts “challenge quotes” wherein the customer provides a competing quote and specifications for Lim-Pac to counter-offer against.

We are an engineering company and not a retailer or distributor. Clients hire us to calculate the cost of their projects and integrate our technology into a total system in a manner that provides better value and better features than any competitor. It takes many hours to engineer and calculate all the hundreds of options for all of the thousands of variables for each pro-forma financial projection for a complete system, including amortization allowances (even if it contains guesses about the cost of equipment). A competitor may back- load the costs and bill you on the back-end but we have always come out at least 30 to 40% lower cost, overall, after a project is completed. We can get, or build, any equipment needed. If a client decides to produce a specification document on their own,  we would be glad to quote once the client has the specifications engineered.

As with all custom NRE products: ordering a single unit is very expensive, ordering many units makes each unit not very expensive.

Customers are also invited to “invest in the future” and place a high volume order for their marketing groups to re-sell to specialized markets.